Driving Efficiency in Commissioning – The Future of Automated Completion Tracking

WorkPacks | AWP | Advanced Work Packaging | AWP Solution | The Best AWP Software

Commissioning is the final step before project turnover, ensuring that systems are tested, validated, and ready for operation. Often, this phase of the project is already delayed based on previous setbacks, may beginning in the scramble to ensure systems are ready for final testing and handover due to the complexity of transitioning from area-based completions to systems-based completions. While previous stages of the completions process often already stress the efficiency of the final commissioning stage, final commissioning has its own unique challenges and solutions to reduce delays in obtaining the Systems Completion Certificate (SCC), and improve a rushed, inefficient turnover process.

Legacy Challenges:

Final Punch Clearance Bottlenecks

  • Unverified Type-C ITRs create confusion over what has been completed and what still needs attention.
  • Manual Tracking of Punch C Clearance leads to errors, omissions, and prolonged approval times.
  • Delays in Systems Completion Certification (SCC) Approval due to missing or misfiled documentation.

Challenges in Transitioning from Area-Based to Systems-Based Completions

  • Complex Coordination Across Disciplines: Unlike area-based completion, where teams focus on specific sections, systems-based completion requires cross-functional collaboration between engineering, construction, and commissioning teams.
  • Data Integration Issues: Legacy systems often lack the ability to centralize commissioning data, making it difficult to transition from area-based tracking to system-wide validation.
  • Inefficient Handover Process: Without an automated digital data infrastructure, there is a risk of turnover documentation being incomplete or inaccurate, leading to costly rework.

How WorkPacks Enhances Commissioning & Handover:

  • Automated Type-C ITR Validation ensures real-time verification of commissioning activities.
  • Commissioning Test Procedures Are Digitized, reducing manual errors and keeping test execution on track.
  • Intelligent Punch C Clearance Tracking ensures that all punch items are cleared before SCC approval.
  • Seamless Transition to System-Based Completion Tracking: WorkPacks automates the transition by linking commissioning data to functional systems rather than physical areas, ensuring a smooth and structured turnover process.

By embracing the necessary transition from area-based to a systems-based completion approach, WorkPacks ensures that commissioning activities align with operational requirements, eliminating delays and ensuring a seamless transition to project closeout.

The Future of Completion Management

Controlling the transition from area-based to systems-based completions represents a fundamental shift in how construction projects are managed. While the transition presents challenges, WorkPacks provides the automation, intelligence, and digital tracking needed to make this shift seamless. By streamlining construction, pre-commissioning, and commissioning, WorkPacks ensures projects are completed on time, with accuracy, and with full visibility into system readiness.