Construction projects are some of the most complex endeavors in the world, often involving thousands of stakeholders, countless deliverables, and vast amounts of data. The consequences of this complexity or vast but one main issue is the creation of information silos throughout the project. Engineering teams design in isolation, procurement manages materials without visibility into workface priorities, and construction crews juggle fragmented work scopes that don’t reflect the data in the schedule. The result is inefficiency, misalignment, and wasted effort.
By acting as a digital hub for data, processes, and people, WorkPacks creates a single point of truth that de-silos information throughout the project—from early planning to commissioning and start-up.
From the Workface Outward: Aligning Crafts and Disciplines
At its core, construction is about people in the field executing work packages safely, efficiently, and on time. But the field is only as effective as the information and materials they receive. WorkPacks integrates multiple crafts and disciplines into a unified workface planning environment, ensuring that every Installation Work Package (IWP) reflects accurate engineering data, material readiness, and schedule alignment.
With automated data alignment and validation built in, field crews no longer waste time reconciling mismatched instructions or missing materials. Instead, IWPs arrive constraint-free, coordinated across trades, and ready for execution. This workface-first approach not only increases productivity in the field but also creates a feedback loop that informs higher-level planning.
Early-Stage Alignment: Engineering, Procurement, and Construction
The same principle of integration that benefits the workface applies upstream in the project lifecycle. WorkPacks connects engineering, procurement, and construction data into a single ecosystem, aligning design intent with material availability and construction execution.
- Engineering deliverables are validated against procurement timelines.
- Procurement status is automatically checked against construction schedules.
- Construction readiness is continuously assessed to ensure work can start as planned.
By providing this early and ongoing visibility, WorkPacks prevents downstream surprises—where a missing model attribute, a late material, or a misaligned package release plan can derail progress. Instead, teams across EPCs, owners, and contractors operate with a shared understanding of readiness.
Transitioning Seamlessly: From Area-Based to Systems-Based Construction
Intuitive, area-based approaches often complicate the systems-based requirements of commissioning and start-up. This disconnect can create challenges at the very moment when projects need momentum to reach the finish line.
WorkPacks bridges this gap by integrating systems and commissioning data directly into construction workflows. As IWPs close in the field, WorkPacks links those completions to system-level readiness, ensuring a smooth transition between construction and commissioning. Automated validations and dashboards provide real-time visibility into both area and system completions, eliminating the confusion of tracking IWP completion systems completions in parallel.
One Platform, Many Stakeholders
The power of WorkPacks lies not just in connecting data, but in connecting people. Owners gain visibility into project progress and alignment. EPCs and contractors coordinate with procurement and engineering teams. Field crews receive clear, validated instructions that reduce downtime.
Every stakeholder, from executives to supervisors to craft workers, operates within interfaces tailored to their role—but always connected to the same underlying source of truth. This removes silos from project start to finish, aligning strategy, planning, and execution across the project lifecycle.
Data Alignment and Efficiency
Construction projects succeed when silos fall and information flows freely. WorkPacks delivers this by integrating data across engineering, procurement, construction, systems, and commissioning—while empowering every stakeholder with the tools they need to align, plan, and execute effectively.
From uniting crafts and disciplines in the field to ensuring efficient transitions into commissioning, WorkPacks isolates and verifies the single sources of truth that projects have long needed. The result is not just better coordination, but a smarter, safer, and more efficient way to deliver projects at scale.